Runoff and flood estimation
Choose a model for the quantity needed. The rational method estimates a peak, curve number estimates event volume, and unit hydrographs distribute excess rainfall through time. Frequency analysis estimates an annual exceedance level under a statistical model.
6.1 Rational peak and empirical flood relations
Past papers · CE 2020–2026 (14 papers): 1 question, 2 marks
The rational method assumes spatially uniform design rain lasting at least the time of concentration, a representative runoff coefficient and negligible detention. Use intensity corresponding to duration and the selected return period. It is suited to small catchments; do not impose one universal catchment-size cutoff.
6.2 Curve-number runoff volume
The SCS/NRCS curve-number method is an empirical storm-volume model. Curve number reflects land cover, hydrologic soil group and antecedent wetness. Group A soils have high infiltration potential; group D soils have low infiltration potential; B and C are intermediate. Use a supplied table rather than assuming a universal value for a land-use name.
6.3 Return period, risk and reliability
Past papers · CE 2020–2026 (14 papers): 4 questions, 5 marks
A -year flood has annual probability of being equalled or exceeded. It does not occur periodically. The following project-life relations assume stationary, independent annual maxima; hydrologic exceedance risk is not identical to probability of structural collapse.
6.4 Flood-frequency magnitude
Use a homogeneous annual-maximum series with an appropriate distribution. Distribution choice, sampling error and extrapolation uncertainty remain even after the arithmetic is correct.
The Gumbel maximum CDF is with location and positive scale (m/s). In the moment convention, and ; substituting gives the formula above. If a normal or log-Pearson frequency-factor method is specified, use in the stated variable; for log-Pearson, compute mean, standard deviation and skew in log space and exponentiate the final log quantile. Use the provided skew-dependent , not the Gumbel factor.
A probable maximum flood is obtained from extreme meteorological inputs and an appropriate catchment model. Standard project flood and probable maximum flood have no universal fixed ratio. A design flood is chosen for the required risk/performance criterion and need not equal either one.
Last-minute recall
- Rational method gives a peak; curve number gives an event depth.
- Use rain intensity for duration equal to time of concentration.
- Keep mm/h, cm/h, hectares and km conversions separate.
- Curve-number initial abstraction is subtracted once per event.
- A larger curve number means smaller retention and generally more runoff.
- Risk is one minus the probability of no exceedance.
- Equal return period and very long project life give risk approaching 63.2%.
- Gumbel uses nested natural logarithms and the maximum distribution.