Question text and figures as in the official paper, with the answer from the official key. Worked solutions for every question are in your report after you take the paper as a 3-hour test.
Even though I had planned to go skiing with my friends, I had to __________ at the
last moment because of an injury.
Select the most appropriate option to complete the above sentence.
(A)
back up
(B)
back of
(C)
back on
(D)
back out
Answer (official key): D
Worked solution: in your report after you take this paper.
Q2 · General Aptitude · MCQ · 1 mark
The President, along with the Council of Ministers, ___________ to visit India next
week.
Select the most appropriate option to complete the above sentence.
(A)
wish
(B)
wishes
(C)
will wish
(D)
is wishing
Answer (official key): B
Worked solution: in your report after you take this paper.
Q3 · General Aptitude · MCQ · 1 mark
An electricity utility company charges ₹ 7 per kWh (kilo watt-hour). If a 40-watt
desk light is left on for 10 hours each night for 180 days, what would be the cost of
energy consumption? If the desk light is on for 2 more hours each night for the 180
days, what would be the percentage-increase in the cost of energy consumption?
(A)
₹ 604.8; 10%
(B)
₹ 504; 20%
(C)
₹ 604.8; 12%
(D)
₹ 720; 15%
Answer (official key): B
Worked solution: in your report after you take this paper.
Q4 · General Aptitude · MCQ · 1 mark
In the context of the given figure, which one of the following options correctly represents the entries in the blocks labelled (i), (ii), (iii), and (iv), respectively?
N
U
F
(i)
21
14
9
6
H
L
(ii)
O
12
(iv)
15
(iii)
(A)
Q, M, 12, and 8
(B)
K, L, 10 and 14
(C)
I, J, 10, and 8
(D)
L, K, 12 and 8
Answer (official key): C
Worked solution: in your report after you take this paper.
Q5 · General Aptitude · MCQ · 1 mark
A bag contains Violet (V), Yellow (Y), Red (R), and Green (G) balls. On counting
them, the following results are obtained:
(i) The sum of Yellow balls and twice the number of Violet balls is 50.
(ii) The sum of Violet and Green balls is 50.
(iii) The sum of Yellow and Red balls is 50.
(iv) The sum of Violet and twice the number of Red balls is 50.
Which one of the following Pie charts correctly represents the balls in the bag?
(A)
(B)
(C)
(D)
Answer (official key): A
Worked solution: in your report after you take this paper.
Q6 · General Aptitude · MCQ · 2 marks
“His life was divided between the books, his friends, and long walks. A solitary
man, he worked at all hours without much method, and probably courted his fatal
illness in this way. To his own name there is not much to show; but such was his
liberality that he was continually helping others, and fruits of his erudition are
widely scattered, and have gone to increase many a comparative stranger’s
reputation.”
(From E.V. Lucas’s “A Funeral”)
Based only on the information provided in the above passage, which one of the
following statements is true?
(A)
The solitary man described in the passage is dead.
(B)
Strangers helped create a grand reputation for the solitary man described in the passage.
(C)
The solitary man described in the passage found joy in scattering fruits.
(D)
The solitary man worked in a court where he fell ill.
Answer (official key): A
Worked solution: in your report after you take this paper.
Q7 · General Aptitude · MCQ · 2 marks
For the clock shown in the figure, if O∗= O Q S Z P R T, and X∗= X Z P W Y O Q, then which one among the given options is most appropriate for P∗?
(A)
P U W R T V X
(B)
P R T O Q S U
(C)
P T V Q S U W
(D)
P S U P R T V
Answer (official key): B
Worked solution: in your report after you take this paper.
Q8 · General Aptitude · MCQ · 2 marks
Consider a five-digit number PQRST that has distinct digits P,Q,R,S, and T,
and satisfies the following conditions:
P<Q,S>P>T,R<T.
If integers 1 through 5 are used to construct such a number, the value of P is:
Three villages P, Q, and R are located in such a way that the distance
PQ=13 km, QR=14 km, and RP=15 km, as shown in the figure.
A straight road joins Q and R. It is proposed to connect P to this road QR by
constructing another road. What is the minimum possible length (in km) of this
connecting road?
Note: The figure shown is representative.
(A)
10.5
(B)
11.0
(C)
12.0
(D)
12.5
Answer (official key): C
Worked solution: in your report after you take this paper.
Q11 · Linear Algebra · MCQ · 1 mark
For the matrix [A] given below, the transpose is ______.
[A]=214343452
(A)
234145432
(B)
452343214
(C)
452214343
(D)
214343452
Answer (official key): A
Worked solution: in your report after you take this paper.
Q12 · Calculus · MCQ · 1 mark
Integration of ln(x) with x i.e., ∫ln(x)dx= ______.
(A)
x.ln(x)−x+Constant
(B)
x−ln(x)+Constant
(C)
x.ln(x)+x+Constant
(D)
A.ln(x)−x+Constant
Answer (official key): A
Worked solution: in your report after you take this paper.
Q13 · Construction Materials and Management · MCQ · 1 mark
Consider the following statements:
(P): Fly ash and ground granulated blast furnace slag can be used as mineral
admixtures in concrete.
(Q): As per IS 456:2000, the minimum moist curing period becomes higher when
a mineral admixture is added to concrete.
Identify the CORRECT option.
(A)
Both (P) and (Q) are TRUE.
(B)
(P) is TRUE and (Q) is FALSE.
(C)
(P) is FALSE and (Q) is TRUE.
(D)
Both (P) and (Q) are FALSE.
Answer (official key): A
Worked solution: in your report after you take this paper.
Q14 · Structural Engineering · MCQ · 1 mark
Consider the pin-jointed truss shown in the figure. Influence line is drawn for
the axial force in the member G-I, when a unit load travels on the bottom chord
of the truss. Identify the CORRECT influence line from the following options:
Note: Positive value corresponds to tension and negative value corresponds to
compression in the member.
(A)
(B)
(C)
(D)
Answer (official key): B
Worked solution: in your report after you take this paper.
Q15 · Geotechnical Engineering · MCQ · 1 mark
The most suitable test for measuring the permeability of clayey soils in the
laboratory is ______.
(A)
Constant head test
(B)
Pumping out test
(C)
Hydrometer test
(D)
Falling head test
Answer (official key): D
Worked solution: in your report after you take this paper.
Q16 · Water Resources Engineering · MCQ · 1 mark
A hydraulic jump occurs in an open channel when the slope of the channel changes
from ______.
(A)
MILD slope to STEEP slope
(B)
STEEP slope to MILD slope
(C)
MILD slope to ZERO slope
(D)
STEEP slope to a STEEPER slope
Answer (official key): B
Worked solution: in your report after you take this paper.
Q17 · Environmental Engineering · MCQ · 1 mark
The bacteria mainly responsible for crown corrosion in a sewer is ______.
(A)
Methanogenic bacteria
(B)
Denitrifying bacteria
(C)
Sulphur reducing bacteria
(D)
Pseudomonas bacteria
Answer (official key): C
Worked solution: in your report after you take this paper.
Q18 · Transportation Engineering · MCQ · 1 mark
The recommended minimum traffic growth rate and design period considered for
structural design of flexible pavements for national highways in India as per
IRC 37:2018 is ______ percentage and ______ years, respectively.
(A)
5, 20
(B)
5, 30
(C)
7, 20
(D)
7, 30
Answer (official key): A
Worked solution: in your report after you take this paper.
Q19 · Transportation Engineering · MCQ · 1 mark
After applying the correction for elevation and temperature, the runway length is
700 m. The corrected runway length (in m) for an effective gradient of 1% is
______ (round off to the nearest integer).
(A)
840
(B)
700
(C)
720
(D)
740
Answer (official key): A
Worked solution: in your report after you take this paper.
Q20 · Transportation Engineering · MCQ · 1 mark
The point where the road alignment changes from a tangent to a curve is known as
______.
(A)
Point of deflection
(B)
Point of intersection
(C)
Point of curve
(D)
Point of tangency
Answer (official key): C
Worked solution: in your report after you take this paper.
Q21 · Calculus · MSQ · 1 mark
Consider a velocity vector, V in (x, y, z) coordinates given below. Pick one or more CORRECT statements(s) from the choices given below.
Given that A and B are not null sets, which of the following statements
regarding probability is/are CORRECT?
(A)
P(A∩B)=P(A)P(B), if A and B are mutually exclusive.
(B)
P(A∣B)=1 if B⊂A.
(C)
P(A∪B)=P(A)+P(B), if A and B are mutually exclusive.
(D)
P(A∩B)=0, if A and B are independent.
Answer (official key): B, C
Worked solution: in your report after you take this paper.
Q23 · Construction Materials and Management · MSQ · 1 mark
In the context of construction materials, which of the following statements is/are
CORRECT?
(A)
If the characteristic strength is defined as that value below which not more than 50% results are expected to fall, the target mean strength in mix design will be taken same as the characteristic strength irrespective of the degree of quality control expected at the site.
(B)
Ten percent fines value is a non-dimensional quantity.
(C)
The stress-strain curve of concrete for 1-day duration of loading is associated with a smaller secant modulus of elasticity compared to the stress-strain curve of the same concrete for 10-minutes duration of loading.
(D)
The increase of carbon in steel usually leads to an increase in its 0.2% proof stress.
Answer (official key): A, C, D
Worked solution: in your report after you take this paper.
Q24 · Geotechnical Engineering · MSQ · 1 mark
Which of the following statements is/are INCORRECT?
(A)
As the depth of the ground water table from the ground surface increases, the effective stress in the soil decreases.
(B)
Bulking of moist sand is due to the capillary action in the sand.
(C)
The effective stress in a liquified soil is almost zero.
(D)
The earth pressure at any point in the soil, under all conditions, is always smaller than the vertical effective stress at that point.
Answer (official key): A, D
Worked solution: in your report after you take this paper.
Q25 · Water Resources Engineering · MSQ · 1 mark
Pick one or more CORRECT statement(s) in the context of upstream and downstream
cut-offs provided below the concrete apron of weirs/barrages constructed across
alluvial rivers.
(A)
Cut-offs are provided to increase the rate of flow over the weir/barrage.
(B)
Cut-offs are provided to increase the seepage length and prevent failure due to piping.
(C)
The bottom level of cut-offs mainly depends on the scour depth.
(D)
Cut-offs are provided to ensure occurrence of hydraulic jump within the stilling basin.
Answer (official key): B, C
Worked solution: in your report after you take this paper.
Q26 · Water Resources Engineering · MSQ · 1 mark
In the context of the effect of drainage density on run-off generation and the
hydrograph at the catchment outlet, all other factors remaining the same, pick one
or more CORRECT statement(s).
(A)
Lower drainage density results in higher peak in flood hydrograph compared to that when the drainage density is higher.
(B)
Lower drainage density results in lower peak in flood hydrograph compared to that when the drainage density is higher.
(C)
Lower drainage density results in a flood hydrograph with a longer time base compared to that when the drainage density is higher.
(D)
Lower drainage density results in a flood hydrograph with a shorter time base compared to that when the drainage density is higher.
Answer (official key): B, C
Worked solution: in your report after you take this paper.
Q27 · Environmental Engineering · MSQ · 1 mark
Identify the treatment technology/technologies NOT recommended for highly
biodegradable organic solid wastes.
(A)
Biohydrogenation
(B)
Anaerobic digestion
(C)
Composting
(D)
Open dumping
Answer (official key): D
Worked solution: in your report after you take this paper.
Q28 · Transportation Engineering · MSQ · 1 mark
Which of the following statements is/are INCORRECT?
(A)
Bitumen having lower softening point is preferred in warm climate regions.
(B)
The viscosity of bitumen influences the mixing and compaction of bituminous mix.
(C)
Air voids in the range of 3% to 5% are required to arrive at the optimum bitumen content.
(D)
The purity of bitumen can be determined using Solubility Test.
Answer (official key): A
Worked solution: in your report after you take this paper.
Q29 · Ordinary Differential Equations · Numerical · 1 mark
The “order” of the following ordinary differential equation is ______:
The design shear strength of a reinforced concrete rectangular beam with a width
of 250 mm and an effective depth of 500 mm is 0.3 MPa. The torsional moment
capacity of the section (in kN·m) under pure torsion, as per IS 456:2000, is
______ (round off to one decimal place).
Answer (official key): 5.7 to 6
Worked solution: in your report after you take this paper.
Q31 · Geotechnical Engineering · Numerical · 1 mark
From a flow-net diagram drawn under a concrete dam, following information are
obtained:
(i) The head difference between upstream and downstream side of the dam is 9 m.
(ii) The total number of equipotential drops between upstream and downstream side
of the dam is 10.
(iii) The length of the field nearest to the toe of the dam in the downstream side
is 1 m.
If the soil below the dam is having a saturated unit weight of 21 kN/m³ and unit
weight of water is 9.81 kN/m³, then the factor of safety against the quick condition
will be ______ (round off to two decimal places).
Answer (official key): 1.24 to 1.3
Worked solution: in your report after you take this paper.
Q32 · Geotechnical Engineering · Numerical · 1 mark
A 6 m thick clay stratum has drainage at both its top and bottom surfaces due to
sand strata. The time to complete 50% consolidation is 2 years. The coefficient
of volume change mv is 1.51×10−3 m²/kN and unit weight of water is
9.81 kN/m³.
The coefficient of permeability (in m/year) is ______
(round off to three decimal places).
Answer (official key): 0.01 to 0.015
Worked solution: in your report after you take this paper.
Q33 · Water Resources Engineering · Numerical · 1 mark
Consider steady flow of water in the series pipe system shown below, with
specified discharge. The diameters of Pipes A and B are 2 m and 1 m,
respectively. The lengths of pipes A and B are 100 m and 200 m, respectively.
Assume the Darcy-Weisbach friction coefficient, f, as 0.01 for both the pipes.
The ratio of head loss in Pipe-B to the head loss in Pipe-A is ______
(round off to the nearest integer).
Q34 · Environmental Engineering · Numerical · 1 mark
Free residual chlorine concentration in water was measured to be 2 mg/l (as Cl2). The pH of water is 8.5. By using the chemical equation given below, the HOCl concentration (in µmoles/l) in water is ________________ (round off to one decimal place).
HOCl⇌H++OCl−,pK=7.50
Atomic weight: Cl(35.5)
Answer (official key): 2.5 to 2.6
Worked solution: in your report after you take this paper.
Q35 · Geomatics Engineering · Numerical · 1 mark
A surveyor measured the distance between two points on the plan drawn to a scale
of 1 cm = 40 m and the result was 468 m. Later, it was discovered that the scale
used was 1 cm = 20 m.
The true distance between the points (in m) is ______
(round off to the nearest integer).
Answer (official key): 936
Worked solution: in your report after you take this paper.
Q36 · Ordinary Differential Equations · MCQ · 2 marks
Pick the CORRECT solution for the differential equation
dxdy=ex−y.
(A)
y=ln(ex+C)
(B)
ln(y)=x+C
(C)
ln(y)=ln(ex)+C
(D)
y=x+C
Answer (official key): A
Worked solution: in your report after you take this paper.
Q37 · Structural Engineering · MCQ · 2 marks
A circular tube of thickness 10 mm and diameter 250 mm is welded to a flat plate
using a 5 mm fillet weld along the circumference. Assume Fe410 steel and shop
welding.
As per IS 800:2007, the torque that can be resisted by the weld (in kN·m) is
______ (round off to one decimal place).
(A)
65.1
(B)
78.1
(C)
156.2
(D)
130.2
Answer (official key): A
Worked solution: in your report after you take this paper.
Q38 · Structural Engineering · MCQ · 2 marks
The figure shows a propped cantilever with uniform flexural rigidity EI (in N.m²) and subjected to a moment M (in N.m). Consider forces and displacements in the upward direction as positive. Find the upward reaction at the propped support B (in N) when this support settles by (−Δ), given in metres.
(A)
2L3M−L36EIΔ
(B)
3L8M−L32EIΔ
(C)
2L3M−L33EIΔ
(D)
LM−L38EIΔ
Answer (official key): C
Worked solution: in your report after you take this paper.
Q39 · Structural Engineering · MCQ · 2 marks
Let the state of stress at a point in a body be the difference of two plane states of stress shown in the figure. Consider all the possible planes perpendicular to the x-y plane and passing through that point. The magnitude of the maximum compressive stress on any such plane is kσ0, where k is equal to _____ (round off to one decimal place).
(A)
3.0
(B)
2.1
(C)
1.7
(D)
1.5
Answer (official key): B
Worked solution: in your report after you take this paper.
Q40 · Structural Engineering · MCQ · 2 marks
Consider a reinforced concrete beam section of width 350 mm and overall depth
600 mm. The tension steel area is 800 mm² at an effective cover of 40 mm.
Concrete is M20 and steel is Fe415.
The IS 456:2000 concrete stress block is replaced by an equivalent rectangular
stress block with no change in:
(a) area of the stress block,
(b) design strength of concrete at strain 0.0035, and
(c) neutral-axis location at flexural collapse.
The ultimate moment of resistance (in kN·m), rounded to the nearest integer, is:
(A)
170
(B)
148
(C)
125
(D)
102
Answer (official key): B
Worked solution: in your report after you take this paper.
Q41 · Geotechnical Engineering · MCQ · 2 marks
For a partially saturated soil deposit at a construction site, water content (w) is 15%, degree of saturation (S) is 67%, void ratio (e) is 0.6 and specific gravity of solids in the soil (Gs) is 2.67. Consider unit weight of water as 9.81 kN/m³. To fully saturate 5 m³ of this soil, the required weight of water (in kN) will be ______ (round off to the nearest integer).
(A)
5
(B)
6
(C)
7
(D)
8
Answer (official key): B
Worked solution: in your report after you take this paper.
Q42 · Water Resources Engineering · MCQ · 2 marks
Consider flow in a long and very wide rectangular open channel. Width of the channel can be considered as infinity compared to the depth of flow. Uniform flow depth is 1.0 m. The bed slope of the channel is 0.0001. The Manning roughness coefficient value is 0.02. Acceleration due to gravity, g can be taken as 9.81 m/s². The critical depth (in m) corresponding to the flow rate resulting from the above conditions is ______ (round off to one decimal place).
(A)
0.4
(B)
0.3
(C)
0.6
(D)
0.1
Answer (official key): B
Worked solution: in your report after you take this paper.
Q43 · Transportation Engineering · MCQ · 2 marks
Match Column I with Column II.
Column I
Column II
(1) Vehicle Damage Factor
A. Stability of subgrade soil
(2) Passenger Car Unit
B. Capacity of a roadway
(3) Perception Reaction Time
C. Design rigid pavement
(4) California Bearing Ratio
D. Design flexible pavement
E. Stopping sight distance
(A)
(1)-(D); (2)-(B); (3)-(E); (4)-(A)
(B)
(1)-(C); (2)-(B); (3)-(D); (4)-(A)
(C)
(1)-(D); (2)-(E); (3)-(B); (4)-(A)
(D)
(1)-(D); (2)-(B); (3)-(A); (4)-(E)
Answer (official key): A
Worked solution: in your report after you take this paper.
Q44 · Calculus · MSQ · 2 marks
Consider the function given below and pick one or more CORRECT statement(s) from the following choices.
f(x)=x3−215x2+18x+20
(A)
f(x) has a local minimum at x=3.
(B)
f(x) has a local maximum at x=3.
(C)
f(x) has a local minimum at x=2.
(D)
f(x) has a local maximum at x=2.
Answer (official key): A, D
Worked solution: in your report after you take this paper.
Q45 · Linear Algebra · MSQ · 2 marks
Pick the CORRECT eigen value(s) of the matrix [A] from the following choices.
[A]=[6482]
(A)
10
(B)
4
(C)
-2
(D)
-10
Answer (official key): A, C
Worked solution: in your report after you take this paper.
Q46 · Structural Engineering · MSQ · 2 marks
In the pin-jointed truss shown in the figure, the members that carry zero force are identified. Which of the following options is/are zero-force members?
(A)
BC
(B)
EG
(C)
FI
(D)
JK
Answer (official key): A, D
Worked solution: in your report after you take this paper.
Q47 · Geotechnical Engineering · MSQ · 2 marks
In the context of shear strength of soil, which of the following statements is/are
CORRECT?
(A)
The unconfined compression test is a special case of the unconsolidated-undrained (UU) triaxial test.
(B)
Shear-strength parameters from consolidated-drained (CD) triaxial tests should be used to analyse rapid construction in clay.
(C)
Vane shear test is commonly used for determining in-situ undrained strength of saturated clay soils.
(D)
In an unconsolidated-undrained (UU) triaxial test, the angle of internal friction ϕ is equal to zero.
Answer (official key): A, C, D
Worked solution: in your report after you take this paper.
Q48 · Water Resources Engineering · MSQ · 2 marks
The drag force, FD on a sphere due to a fluid flowing past the sphere is a function of viscosity, µ, the mass density, ρ, the velocity of flow, V, and the diameter of the sphere, D. Pick the relevant (one or more) non-dimensional parameter(s) pertaining to the above process from the following list.
(A)
ρV2D2FD
(B)
V2D2ρFD
(C)
μρVD
(D)
VDμρ
Answer (official key): A, C
Worked solution: in your report after you take this paper.
Q49 · Environmental Engineering · MSQ · 2 marks
A compound has a general formula CaHbOcNd and molecular weight 187. A 935 mg/l solution of the compound is prepared in distilled deionized water. The Total Organic Carbon (TOC) is measured as 360 mg/l (as C). The Chemical Oxygen Demand (COD) and the Total Kjeldahl Nitrogen (TKN) are determined as 600 mg/l (as O2) and 140 mg/l (as N), respectively (as per the chemical equation given below). Which of the following options is/are CORRECT?
Worked solution: in your report after you take this paper.
Q50 · Transportation Engineering · MSQ · 2 marks
The free flow speed of a highway is 100 km/h and its capacity is 4000 vehicle/h. Assume speed density relation is linear. For a traffic volume of 2000 vehicle/h, choose all the possible speeds (in km/h) from the options given below (round off to two decimal places).
(A)
85.36
(B)
65.20
(C)
14.64
(D)
7.22
Answer (official key): A, C
Worked solution: in your report after you take this paper.
Q51 · Probability and Statistics · Numerical · 2 marks
Consider a discrete random variable X whose probabilities are given below. The standard deviation of the random variable is ______ (round off to one decimal place).
xi
1
2
4
8
P(X=xi)
0.3
0.1
0.3
0.3
Answer (official key): 2.7 to 2.9
Worked solution: in your report after you take this paper.
Q52 · Structural Engineering · Numerical · 2 marks
A steel beam supported by three parallel pin-jointed steel rods is shown in the
figure. The beam has moment of inertia 8×107 mm⁴ and steel modulus
E=210 GPa. It carries a uniformly distributed load of 6.25 kN/m including
self-weight.
The axial force (in kN) in the centre rod CD is ______
(round off to one decimal place).
Answer (official key): 16.3 to 16.6
Worked solution: in your report after you take this paper.
Q53 · Construction Materials and Management · Numerical · 2 marks
The network diagram for a construction project is shown below. Activities A, B,
C, D, E and F are represented by arrows and their durations are shown in days.
The total float available for activity E, in days, is ______
(round off to the nearest integer).
Answer (official key): 1
Worked solution: in your report after you take this paper.
Q54 · Structural Engineering · Numerical · 2 marks
A reinforced concrete beam has a support section with width of 300 mm and effective depth of 500 mm. The support section is reinforced with 3 bars of 20 mm diameter at the tension side. Two-legged vertical stirrups of 10 mm diameter and Fe415 steel at a spacing of 100 mm are provided as shear reinforcement. Assume that there is no possibility of diagonal compression failure at the section. As per IS 456:2000, the maximum shear resisted by the vertical stirrups (in kN), as per limit state design, is ___________ (round off to one decimal place).
Answer (official key): 283 to 284
Worked solution: in your report after you take this paper.
Q55 · Geotechnical Engineering · Numerical · 2 marks
The canal-bank profile and trial slip circle are shown in the figure. The soil is
homogeneous saturated clay with bulk unit weight 20 kN/m³, undrained cohesion
30 kPa, and ϕu=0. The area of sliding mass ABCDEA is 150 m² and its
centroid is at P. A 2.5 m deep tension crack DE is completely filled with water.
Take γw=9.81 kN/m³ and 1 m run of bank.
The factor of safety against slope failure is ______
(round off to two decimal places).
Answer (official key): 1 to 1.1
Worked solution: in your report after you take this paper.
Q56 · Geotechnical Engineering · Numerical · 2 marks
A designer used plate load test to obtain the value of the bearing capacity factor Nγ. A circular plate of 1 m diameter was placed on the surface of a dry sand layer extending very deep beneath the ground. The unit weight of the sand is 16.66 kN/m³. The plate is loaded to failure at a pressure of 1500 kPa. Considering Terzaghi’s bearing capacity theory, the bearing capacity factor Nγ is ______ (round off to the nearest integer).
Answer (official key): 300
Worked solution: in your report after you take this paper.
Q57 · Geotechnical Engineering · Numerical · 2 marks
A 4 × 4 group pile, with each pile 20 m long and 500 mm in diameter, is installed in a square pattern in a clayey soil, as shown in the figure. The average unconfined compressive strength of the soil is 100 kN/m², and the adhesion factor is 0.8. Neglect the bearing at the tip of the piles. For a group efficiency factor of 1.0, the centre to centre spacing (s) of the piles (in m) would be ________ (round off to two decimal places).
Answer (official key): 1.5 to 1.52
Worked solution: in your report after you take this paper.
Q58 · Water Resources Engineering · Numerical · 2 marks
A 60 cm diameter well completely penetrates a confined aquifer of permeability 5×10−4 m/s. The length of the strainer (spanning the entire thickness of the aquifer) is 10 m. The drawdown at the well under steady state pumping is 1.0 m. Assume that the radius of influence for this pumping is 300 m. The discharge from the well (in litres per minute) is ______ (round off to the nearest integer).
Answer (official key): 271 to 273
Worked solution: in your report after you take this paper.
Q59 · Water Resources Engineering · Numerical · 2 marks
The peak of flood hydrograph due to a 3-hour duration storm in a catchment is 180 m³/s. The total rainfall depth is 6.6 cm. It can be assumed that the average infiltration loss is 0.2 cm/h. There are no other losses. The base flow is constant at a value of 30 m³/s. The peak value of the 3-hour unit hydrograph for this catchment (in m³/s) is ______ (round off to the nearest integer).
Answer (official key): 25
Worked solution: in your report after you take this paper.
Q60 · Water Resources Engineering · Numerical · 2 marks
The shaft of a 6 m wide gate in the figure will fail at a moment of 3924 kN.m about the hinge P. The maximum value of water depth h (in m) that the gate can hold is ________________ (round off to the nearest integer).
Note: Density of water = 1000 kg/m³; Acceleration due to gravity = 9.81 m/s²
Answer (official key): 7 to 9
Worked solution: in your report after you take this paper.
Q61 · Environmental Engineering · Numerical · 2 marks
A water sample has the following concentrations, all expressed as mg/L as
CaCO3:
The non-carbonate hardness (in mg/L as CaCO3) is ______ (integer).
Answer (official key): 50
Worked solution: in your report after you take this paper.
Q62 · Environmental Engineering · Numerical · 2 marks
A community generates 1 million litres/day (MLD) of wastewater. This wastewater is treated using activated sludge process (ASP). The working volume of the aeration tank of the ASP is 250 m³, and the biomass concentration in the tank is 3000 mg/L. Analyses results showed that a biomass concentration of 10 mg/L is present in the treated effluent from the secondary sedimentation tank of the ASP. Sludge wastage from the system is at a rate of 5000 L/day with a biomass concentration of 10000 mg/L. The system is in steady state condition. The biological sludge residence time (BSRT) of the system (in days) is______ (round off to one decimal place).
Answer (official key): 12.3 to 12.7
Worked solution: in your report after you take this paper.
Q63 · Environmental Engineering · Numerical · 2 marks
A settling chamber is used for the removal of discrete particulate matter from air with following conditions. Horizontal velocity of air = 0.2 m/s; Temperature of air stream = 77°C; Specific gravity of particle to be removed = 2.65; Chamber length = 12 m; Chamber height = 2 m; Viscosity of air at 77°C = 2.1 × 10⁻⁵ kg/m.s; Acceleration due to gravity (g) = 9.81 m/s²; Density of air at 77°C = 1.0 kg/m³; Assume the density of water as 1000 kg/m³ and Laminar condition exists in the chamber. The minimum size of particle that will be removed with 100% efficiency in the settling chamber (in µm) is ______ (round off to one decimal place).
Answer (official key): 21 to 45
Worked solution: in your report after you take this paper.
Q64 · Transportation Engineering · Numerical · 2 marks
On a two-lane highway, a horizontal curve has radius 300 m and design speed
80 km/h. The longest wheelbase expected is 7 m.
The extra widening required (in m) is ______
(round off to two decimal places).
Answer (official key): 0.63 to 0.66
Worked solution: in your report after you take this paper.
Q65 · Geomatics Engineering · Numerical · 2 marks
If the fore bearings of lines AB and BC are 60∘ and 122∘,
respectively, the interior angle ∠ABC (in degrees) is ______
(round off to the nearest integer).
Answer (official key): 118
Worked solution: in your report after you take this paper.