Syllabus map
Every row below is from section 4 of the GATE ME syllabus, Materials, Manufacturing and Industrial Engineering.
| Syllabus topic (official wording) | Sections | Branch | New in 2027 |
|---|---|---|---|
| Work study | 1.1–1.3 | ME | Yes |
| Productivity | 1.4–1.5 | ME | Yes |
| Forecasting models | 2.1–2.5 | ME | No |
| Aggregate production planning | 3.1–3.3 | ME | No |
| Scheduling | 4.1–4.4 | ME | No |
| Materials requirement planning | 5.1–5.3 | ME | No |
| Six sigma | 8.1–8.2 | ME | Yes |
| Lean manufacturing | 7.1–7.3 | ME | No |
| Inventory Control – deterministic models | 6.1–6.4 | ME | No |
| safety stock | 6.5 | ME | No |
| inventory control systems | 6.6–6.7 | ME | No |
| Quality and reliability concepts for product lifecycle analysis | 8.3–8.5; 9.1–9.4 | ME | Yes |