Chapter 8

Six Sigma and quality control

Quality connects customer requirements to design, production and field performance. Statistical control asks whether a process is stable; capability asks whether its stable output meets specifications. Keep these questions separate when interpreting limits or defect probabilities.

8.1 Six Sigma improvement and defect metrics

DMAIC means define the problem and customer need, measure the current process, analyse causes, improve the process, and control the gains. For a new design, DMADV means define, measure, analyse, design, verify. A critical-to-quality characteristic translates a customer requirement into something measurable.

8.2 Capability and combined variation

Past papers · ME 2020–2026 (10 papers): 1 question, 2 marks

8.3 Quality across the product lifecycle

Lifecycle stageQuality/reliability task
Requirements and designDefine function, use conditions and measurable requirements; review failure modes
Development and validationVerify design meets specifications; validate it meets user needs; test under representative conditions
ProductionControl process variation, inspect appropriately, prevent recurrence of defects
Use and serviceMonitor failures, maintain equipment, analyse warranty/field returns
Retirement and feedbackPlan disposal/reuse and feed lifecycle evidence into redesign

Quality of design concerns the chosen requirements; quality of conformance concerns meeting them. Quality assurance builds confidence through planned systems; quality control measures and controls output/process performance. Inspection alone does not prevent defects.

Cost categoryTypical example
PreventionTraining, mistake-proofing, process planning
AppraisalInspection, testing, measurement-system checks
Internal failureScrap or rework before delivery
External failureReturns, warranty repair, field corrective action

Use check sheets to collect counts, Pareto charts to prioritise categories, cause-and-effect diagrams to organise hypotheses, histograms to inspect distributions, scatter plots to examine association, and control charts to follow time order. Pareto's 80/20 split is a heuristic, not a mandatory data ratio. FMEA reviews failure mode, effect, cause and controls; where the problem defines a risk priority number, RPN = severity × occurrence × detection ratings. A large detection rating commonly means poor detectability; follow the stated scale. RPN is a ranking aid, not a failure probability.

8.4 Statistical process control

Common-cause variation belongs to the operating process; special/assignable causes signal a change to investigate. A process can be stable and still make nonconforming units. Control limits are inferred from process statistics; specifications come from functional/design requirements.

The following rounded normal-range factors support common small-subgroup questions.

nnA2A_2D3D_3D4D_4
21.88003.267
31.02302.575
40.72902.282
50.57702.115
60.48302.004
70.4190.0761.924
80.3730.1361.864
90.3370.1841.816
100.3080.2231.777

8.5 Acceptance sampling

A single-sampling plan accepts a lot if the number of nonconforming sampled units is at most an acceptance number. Sampling determines lot disposition; it does not by itself stabilise the manufacturing process. The operating-characteristic (OC) curve plots probability of acceptance against incoming fraction nonconforming.

Last-minute recall

  • DPMO counts opportunities, not merely units.
  • The 3.4 DPMO convention includes a 1.5σ shift.
  • A total 6σ spread means ±3σ.
  • CpC_p ignores centring; CpkC_{pk} does not.
  • Independent variances add even when dimensions subtract.
  • Process control limits and product specifications answer different questions.
  • Choose p/npp/np for nonconforming units and c/uc/u for defect counts.
  • Producer's risk rejects good quality; consumer's risk accepts poor quality.

Revise offline: the whole Production Planning and Control handbook as one PDF

49 pages · 2.2 MBFree to read online. Sign in to download the PDF.We save the handbook, version and request time in My downloads. Privacy policy

All chapters · Corrections