Chapter 2

Water requirement and distribution

Forecast the service population and calculate average demand before applying peaks. Separate storage, conveyance and distribution: they need not be designed for the same flow rate.

2.1 Population forecasting

Choose a method from the growth pattern and the question. No extrapolation method is guaranteed to give the largest forecast for every data set.

Arithmetic growth suits a nearly constant absolute increment; geometric growth assumes constant percentage increase. The incremental method uses the historical mean increment as its base. If extrapolating from the latest increment instead, write that recurrence explicitly; it is a different assumption.

2.2 Demand, peaks and storage

Domestic, institutional, industrial, public-use, fire and loss allowances form the total demand. Use the problem's per-capita allowance. A value such as 135 L/(person·d) is a design assumption, not a universal demand for all settlements.

Conventional examination factors are fd=1.8f_d=1.8, fh=1.5f_h=1.5, giving a peak-hour rate 2.7 times the annual mean rate; use them only when that convention is intended. For distribution, compare peak-hour demand with maximum-day plus fire demand on the same time basis. If pumping lasts only part of a day, divide daily volume by actual pumping hours.

IS 1172:1993, fourth revision, gives 100–150 L/(person·d) for communities of 20,000–100,000 with full flushing and 150–200 above 100,000; its note permits reduction to 135 for LIG/EWS housing according to conditions. Selected non-residential allowances are hostels 135 L/(person·d), offices 45 L/(person·d), restaurants 70 L/(seat·d). These are edition-specific values from the code text hosted by MoHUA.

2.3 Distribution layouts and appurtenances

ArrangementUseful featureMain limitation
Dead-end/treeSimple expansion and calculationStagnation at ends; isolation interrupts downstream supply
Grid/loopMultiple supply paths; better circulationMore valves and network analysis
RingPeripheral main supplies internal branchesRequires suitable road layout and investment
RadialZoned supply from central storageDepends on planned radial layout

Gravity supply uses source elevation; pumping supply depends on pumps; pumping to an elevated service reservoir combines pumping with gravity distribution and balancing storage. A continuous positive-pressure system reduces intrusion risk. Intermittent supply can draw contaminants through leaks when pressure falls.

Sluice valves isolate sections; check valves prevent reversal; air valves release trapped air at high points; scour valves drain sediment at low points and dead ends. Hydrants provide fire access. Service reservoirs equalise demand and provide reserve. Pressure-reducing valves protect low-elevation zones. Pipe head loss, pump energy and water hammer: see the Hydraulics handbook.

2.4 Network balance

Assign a positive direction to each pipe. Demand is a withdrawal at a node. A loop sum uses a chosen circulation direction and signed losses; a pump contributes a head gain.

The correction is a first-order linearisation, so repeat until loop residuals are small. At a zero-flow branch with an ill-defined derivative, revise the starting guess or solve the network equations directly.

Last-minute recall

  • Per-capita demand multiplied by population gives volume per day.
  • Maximum-day and peak-hour factors have different reference rates.
  • Convert every demand to a common time unit before comparing.
  • Reservoir equalisation is the range of cumulative inflow minus outflow.
  • A loop network offers alternate paths; a tree does not.
  • Hardy Cross starts with continuity-satisfying flows and corrects energy imbalance.