Formula index

Formula boxSection
Abrams-type strength relation4.2
Absolute-volume balance4.3
Batch yield4.4
Batch, conveyor and hoist production8.4
Compacting factor3.4
Compression and splitting strength5.1
Concrete code property estimates5.2
Contract payment bases9.1
Corrected centre-line quantity6.4
Creep coefficient and effective modulus5.3
Cyclic equipment output8.2
Declining balance and sinking fund8.6
Earned-value measures7.2
Earth-volume conversion8.2
Empirical bid probability and expected profit9.3
Equipment finance and unit cost8.6
Fineness modulus and blending3.1
Flexural test strength5.1
Forecast cost and required efficiency7.3
Haul cycle and matched fleet8.3
Haul resistance and power limit8.3
Idealised silicate hydration2.2
Item quantities and estimate total6.2
Long-wall and short-wall lengths6.3
Moisture correction on a dry-mass basis3.2
Physical progress and remaining duration7.1
Pozzolanic reaction balance2.5
Roller production8.5
Sand bulking correction3.2
Signed free strain components5.3
Steel mass and thermal movement1.3
Steel test quantities1.2
Straight-line and sum-of-years depreciation8.6
Strength percentile and mix target4.1
Trial water and coarse-aggregate adjustment4.3
Unit rate and markup6.5
Water ratio and binder demand4.2