Formula index
| Formula box | Section |
|---|---|
| Abrams-type strength relation | 4.2 |
| Absolute-volume balance | 4.3 |
| Batch yield | 4.4 |
| Batch, conveyor and hoist production | 8.4 |
| Compacting factor | 3.4 |
| Compression and splitting strength | 5.1 |
| Concrete code property estimates | 5.2 |
| Contract payment bases | 9.1 |
| Corrected centre-line quantity | 6.4 |
| Creep coefficient and effective modulus | 5.3 |
| Cyclic equipment output | 8.2 |
| Declining balance and sinking fund | 8.6 |
| Earned-value measures | 7.2 |
| Earth-volume conversion | 8.2 |
| Empirical bid probability and expected profit | 9.3 |
| Equipment finance and unit cost | 8.6 |
| Fineness modulus and blending | 3.1 |
| Flexural test strength | 5.1 |
| Forecast cost and required efficiency | 7.3 |
| Haul cycle and matched fleet | 8.3 |
| Haul resistance and power limit | 8.3 |
| Idealised silicate hydration | 2.2 |
| Item quantities and estimate total | 6.2 |
| Long-wall and short-wall lengths | 6.3 |
| Moisture correction on a dry-mass basis | 3.2 |
| Physical progress and remaining duration | 7.1 |
| Pozzolanic reaction balance | 2.5 |
| Roller production | 8.5 |
| Sand bulking correction | 3.2 |
| Signed free strain components | 5.3 |
| Steel mass and thermal movement | 1.3 |
| Steel test quantities | 1.2 |
| Straight-line and sum-of-years depreciation | 8.6 |
| Strength percentile and mix target | 4.1 |
| Trial water and coarse-aggregate adjustment | 4.3 |
| Unit rate and markup | 6.5 |
| Water ratio and binder demand | 4.2 |