Traffic control and capacity
Intersection control allocates right of way and separates conflicts. Design demand must use consistent vehicle units, lane grouping and peak-period basis before calculating signal capacity or level of service.
8.1 Traffic signs
IRC:67-2022 is the road-sign code edition used here. Sign shape helps recognition before its text is readable.
| Class | Typical shape or exception | Purpose |
|---|---|---|
| Regulatory/mandatory | Usually circular | Legal restrictions, prohibitions or compulsory movements |
| Stop | Octagon | Mandatory stop |
| Give way | Inverted triangle | Yield priority |
| Warning/cautionary | Upright triangle | Alert to a hazard or change ahead |
| Informatory | Usually rectangular | Directions, destinations and services |
A mandatory sign is not advice. A warning of a bend is different from a speed restriction. Road markings supplement signs: a continuous prohibitory line should not be treated like a broken lane line; stop and give-way lines identify control positions. Use the symbol and legend, not colour alone, to distinguish a sign.
8.2 Intersections and interchanges
At-grade intersections can be three-leg (T/Y), four-leg, staggered or multi-leg; control can be priority, signal or roundabout. Channelisation uses islands/markings to guide paths and reduce conflict area. Crossing, merging, diverging and weaving are different conflict types. An ideal four-leg junction allowing all conventional movements has 32 vehicle conflict points: 16 crossing, 8 merging and 8 diverging; this count excludes pedestrian conflicts and changes when movements are prohibited.
| Grade-separated arrangement | Recognition and application |
|---|---|
| Diamond | Four ramps; ramp terminals usually remain at-grade on the minor road; relatively compact |
| Cloverleaf | Loop ramps replace right-turn crossing conflicts in left-hand traffic; weaving occurs between nearby entry/exit ramps |
| Partial cloverleaf | Some loop ramps; balances site constraints and dominant movements |
| Trumpet | Three-leg interchange, often at an expressway terminus |
| Directional/semi-directional | Direct or curved flyovers for major turning streams; larger structure/space cost |
| Stack | Multilevel directional ramps; handles major movements with little loop weaving |
A flyover with no connecting ramps is a grade separation, not a full interchange. Roundabouts replace direct crossing conflicts with merging/diverging and circulating interaction; capacity depends on entry demand, conflicting circulation and geometry. An interchange can still contain weaving and ramp-terminal conflicts.
8.3 Signal timing quantities
Past papers · CE 2020–2026 (14 papers): 2 questions, 3 marks
A phase serves a compatible set of movements. Simultaneous opposing through movements usually share a phase; their critical lane ratios are not automatically added. A lane group is a set of lanes using the same signal indication and operating together.
Steady discharge headway after the first few queued vehicles is saturation headway. Start-up loss is the sum of initial headways' excess above saturation headway. Amber is not necessarily all lost: some vehicles discharge during it. Effective green can exceed displayed green. Avoid counting all-red both in and again outside the cycle accounting.
8.4 Webster cycle and green split
Past papers · CE 2020–2026 (14 papers): 3 questions, 4 marks
Check pedestrian time, minimum green and practical cycle limits after the calculation. A conventional pedestrian estimate is , with start allowance (s), crossing width (m), and pedestrian speed (m/s); frequently supplied values are 7 s and 1.2 m/s. If pedestrian needs dominate, revise the split/cycle and recheck capacity. The theoretical feasibility bound is ; at equality each critical stream is exactly at capacity, leaving no reserve.
8.5 Highway capacity and level of service
Past papers · CE 2020–2026 (14 papers): 1 question, 2 marks
Capacity is the maximum sustainable flow under stated conditions. Design/service flow is the flow compatible with a target service quality. Observed demand can exceed capacity; the excess forms a queue. Level of service (LOS) is an operational-quality category, not a synonym for speed or volume alone.
| LOS | General interpretation |
|---|---|
| A | Free operation, high manoeuvring freedom |
| B | Stable operation with minor interaction |
| C | Stable operation, noticeable interaction and restricted freedom |
| D | High-density stable operation, substantial restriction |
| E | At/near capacity, little reserve; disturbances can trigger breakdown |
| F | Breakdown/oversaturation, queues and unstable stop–go operation |
Facility-specific measures differ: density is important for uninterrupted multilane/freeway operation, control delay for signalised intersections, and speed/following measures for two-lane highways. Use the given manual's thresholds; no universal density table defines all facilities. The same flow below capacity can occur at two speeds/densities.
PCU depends on vehicle size, speed, composition and road conditions; it is not one fixed constant for every truck everywhere. If is absent, AADT alone cannot determine the design-hour demand. Never infer 10% silently to force a question's answer.
Last-minute recall
- Stop is octagonal; give way is an inverted triangle.
- Grade separation without connecting ramps is not a full interchange.
- Use the maximum compatible critical-group ratio within a phase, then sum across phases.
- Saturation flow is per hour of effective green; capacity includes .
- Lost time belongs to the cycle; displayed green and effective green differ.
- Webster requires and needs pedestrian/minimum-green checks.
- LOS thresholds depend on the facility and chosen performance measure.
- Convert AADT to a directional design hour before sizing lanes.