Symbols and units
Symbols are local to their stated section where transport conventions reuse a letter. Tension is positive; road grades are uphill-positive; shock speed is downstream-positive.
| Quantity | Symbol | Unit | Note |
|---|---|---|---|
| Design vehicle speed | , , , | m/s; km/h | Lowercase v in m/s; uppercase V in km/h; b is overtaken vehicle. |
| Road section dimensions | , , , , , , | m; crossfall fraction; lane count | Width, half-width/run, height, crossfall, lanes, wheelbase, extra width. |
| Road curvature | , , , , , , , | m; rad for Δ | Radius/path radius; deflection angle; tangent, arc, chord, external distance and setback. |
| Road friction and braking | , , , , , , , | fractions; m/s²; s | Effective longitudinal/lateral friction, raw friction, brake efficiency; uphill decimal grade positive. |
| Sight distances | , , , | m | Stopping, intermediate, overtaking and generic required visibility. |
| Overtaking construction | , , , , , , | s; m; m/s² | Passing duration, initial observation time, longitudinal allowance, acceleration, component distances. |
| Superelevation and transitions | , , , , , , , , , | fractions; m; m/s³; ratio; rad | e is outer-edge upward slope; elsewhere exp(1) is explicitly identified. |
| Vertical alignment | , , , , , , , , , , , | decimal slopes; m; slope/m; % | is positive grade difference; G family uses numerical percentage values. |
| Visibility heights | , , , , | m; angle | Eye/object/headlight heights, beam angle, crest-height denominator. |
| Railway curve | , , , | degrees; m | Degree of curve, defining arc/chord, versine. |
| Railway cant | , , , , , , , | mm; km/h; count | Dynamic gauge; cant provided/equilibrium/deficiency/excess; average speed; train count. |
| Runway lengths | , , , , , , , , | m | Basic/corrected/full runway, clearway, stopway or stopping length, take-off ground/air segment. |
| Runway environment | , , , , , , , , | m; °C; %; per percentage point | Elevation, temperature terms, effective gradient, profile extrema, specified gradient coefficient. |
| Taxiway/exit geometry | , , , , , , , , , , | m; m/s; s; m/s² | Horonjeff/dynamic radii, pavement width, gear clearance/tread, exit/touchdown station, speeds and braking. |
| Material masses and indices | , , , , , , , , , | consistent mass; % | Dry, saturated-surface-dry, immersed and shape-test masses; index, absorption. |
| Specific gravities | , , , , , , , | 1 | Component/blend, aggregate bulk/apparent/effective, binder, maximum mix, compacted bulk. |
| Mixture composition and volume | , , , , , , , , , | fractions; %; volume; density | Mass fractions except percent; void/binder volumes as percentages as defined in 4.4. |
| Foundation and wheel loading | , , , , , , , , , , , | N/m³ or MPa/m; Pa; m; N | distinct from traffic density k; consistent mm system permitted; z depth in pavement context. |
| Pavement traffic | , , , , , , , , , , , | load; factors; count; CV/day; fraction; years; msa | r fractional annual growth; x opening delay; design-lane fraction with stated count basis. |
| Flexible response | , , , , , , , , , , | MPa; mm; strain; repetitions | Moduli, granular thickness, positive strain magnitudes, regression coefficients and binder factor. |
| Concrete slab | , , , , , , , , , , | Pa; 1; m; N/m³; 1/K | Global E and ν retained; relative stiffness/resisting radius; dimensions; unit weight; base friction; thermal expansion. |
| Slab stresses and temperatures | , , , , , , , , , , , | Pa or MPa; 1; K difference | Tension positive; ΔT=top−bottom; uniform temperature change distinguished. |
| Joint steel | , , , , , , , | m²/m; m²; m; Pa | Steel per joint length, bar area/spacing/diameter, allowable steel/bond stress, full development length, expansion. |
| Concrete fatigue | , , , , , | 1; MPa; repetitions | Stress ratio, flexural strength, expected/allowable repetitions and cumulative damage. |
| Count expansion | , , , , , , , , | veh/day; veh/h; factors; min; count | Hour volume numerically equals one-hour count; peak subinterval rate distinguished. |
| Traffic speed | , , , , , , , , | km/h | Individual, time/space means, region speed, journey speed, mean, percentile, sample/spatial standard deviation. |
| Moving observer | , , , , , , | count; h; km | Met, overtaking observer, passed by observer; against/with stream times, mean trip time and length. |
| Speed statistics | , , , , , , , , , , , , , , | speed; count; fraction; 1 | Class midpoint/count/boundaries, percentile fraction, mixture weights, random speed and threshold/error/normal critical value. |
| Accidents and arrivals | , , , , , , , | count; year; veh/day; rates; veh/s; s | Rates per million veh-km/entries; H here headway, not airport elevation. |
| Fundamental traffic quantities | , , , , , , , , | veh/h; veh/km; s; m; km; h | Space–time trajectories use km and h; effective detector length must match density units. |
| Fundamental diagram parameters | , , , , , , , | km/h; veh/km; veh/h | Free/critical/Greenberg speeds, jam/critical/scale densities; positive backward-wave magnitude. |
| Waves and queues | , , , , , , , , , , | km/h; vehicles; veh/h; h; vehicle-hours | w downstream-positive; cumulative counts and total delay. |
| Signal timing | , , , , , , , , , , , , , , , | s; veh/h; fractions | C cycle, displayed green, effective green; amber; lost time L local to signals. |
| Pedestrian timing | , , , | s; m; m/s | Required crossing time, start allowance, crossing width and walking speed. |
| Capacity adjustments | , , , , , , , , , , | veh/h; PCU/veh; fractions; lanes; pc/h/lane | here adjusted demand, not pedestrian speed; context fixed by section. |
| Trip generation | , , , , , , , | trips/period; fitted units; households; trips/household/period | Productions/origins, attractions, balanced attractions, regression and category inputs. |
| Distribution | , , , , , , | trips/period; cost; factors | Cost units fixed before deterrence; β has reciprocal cost units for exponential. |
| Mode choice | , , , , | probability; dimensionless utility; trips; cost; inverse cost | Higher utility preferred; for disutility model. |
| Assignment | , , , , , , , , | min; veh/h; 1 | Link time/flow/capacity; here link capacity, not railway cant; route flow and link incidence. |
| Bank angle and design limit notation | , , , , | angle; fraction; mm | Bank angle satisfies ; max subscripts denote allowed lateral friction, actual cant, deficiency and excess. |