Symbols and units

Symbols are local to their stated section where transport conventions reuse a letter. Tension is positive; road grades are uphill-positive; shock speed is downstream-positive.

QuantitySymbolUnitNote
Design vehicle speedvv, VV, VbV_b, vbv_bm/s; km/hLowercase v in m/s; uppercase V in km/h; b is overtaken vehicle.
Road section dimensionsWW, bb, Δz\Delta z, cc, nln_l, lwl_w, WeW_em; crossfall fraction; lane countWidth, half-width/run, height, crossfall, lanes, wheelbase, extra width.
Road curvatureRR, RpR_p, Δ\Delta, TcT_c, LcL_c, CcC_c, EcE_c, mmm; rad for ΔRadius/path radius; deflection angle; tangent, arc, chord, external distance and setback.
Road friction and brakingfLf_L, fTf_T, μ\mu, η\eta, gg, aba_b, trt_r, iifractions; m/s²; sEffective longitudinal/lateral friction, raw friction, brake efficiency; uphill decimal grade positive.
Sight distancesSS, SSSDS_{\rm SSD}, SISDS_{\rm ISD}, SOSDS_{\rm OSD}mStopping, intermediate, overtaking and generic required visibility.
Overtaking constructionToT_o, tot_o, sos_o, aoa_o, d1d_1, d2d_2, d3d_3s; m; m/s²Passing duration, initial observation time, longitudinal allowance, acceleration, component distances.
Superelevation and transitionsee, ede_d, emax⁡e_{\max}, LtL_t, JJ, JvJ_v, NrN_r, Δze\Delta z_e, psp_s, ϕs\phi_sfractions; m; m/s³; ratio; rade is outer-edge upward slope; elsewhere exp(1) is explicitly identified.
Vertical alignmenti1i_1, i2i_2, AgA_g, LvL_v, zz, z0z_0, xx, x∗x_*, rgr_g, GG, CgC_g, GcG_cdecimal slopes; m; slope/m; %AgA_g is positive grade difference; G family uses numerical percentage values.
Visibility heightsh1h_1, h2h_2, hfh_f, β\beta, DhD_hm; angleEye/object/headlight heights, beam angle, crest-height denominator.
Railway curveDD, lal_a, lcl_c, mcm_cdegrees; mDegree of curve, defining arc/chord, versine.
Railway cantGdG_d, cac_a, ceqc_{\rm eq}, cdc_d, cxc_x, VeV_e, Vmax⁡V_{\max}, nin_imm; km/h; countDynamic gauge; cant provided/equilibrium/deficiency/excess; average speed; train count.
Runway lengthsL0L_0, LEL_E, LETL_{ET}, LETGL_{ETG}, LrL_r, LclearL_{\rm clear}, LstopL_{\rm stop}, dgd_g, dad_amBasic/corrected/full runway, clearway, stopway or stopping length, take-off ground/air segment.
Runway environmentHH, TsT_s, TrefT_{\rm ref}, TaT_a, TmT_m, GeG_e, zmax⁡z_{\max}, zmin⁡z_{\min}, λg\lambda_gm; °C; %; per percentage pointElevation, temperature terms, effective gradient, profile extrema, specified gradient coefficient.
Taxiway/exit geometryRHR_H, RdynR_{\rm dyn}, WtW_t, sgs_g, bgb_g, xex_e, xtdx_{\rm td}, v1v_1, vev_e, tbt_b, ada_dm; m/s; s; m/s²Horonjeff/dynamic radii, pavement width, gear clearance/tread, exit/touchdown station, speeds and braking.
Material masses and indicesMdM_d, MSSDM_{\rm SSD}, MwM_w, MselectedM_{\rm selected}, MtestedM_{\rm tested}, MfM_f, Me,remainingM_{e,\rm remaining}, M0M_0, II, waw_aconsistent mass; %Dry, saturated-surface-dry, immersed and shape-test masses; index, absorption.
Specific gravitiesGiG_i, GblendG_{\rm blend}, GsbG_{sb}, GsaG_{sa}, GseG_{se}, GbG_b, GmmG_{mm}, GmbG_{mb}1Component/blend, aggregate bulk/apparent/effective, binder, maximum mix, compacted bulk.
Mixture composition and volumewiw_i, psp_s, pbp_b, PiP_i, V\mathcal V, ρw\rho_w, VaV_a, VbeV_{be}, VMA\mathrm{VMA}, VFB\mathrm{VFB}fractions; %; volume; densityMass fractions except PiP_i percent; void/binder volumes as percentages as defined in 4.4.
Foundation and wheel loadingksk_s, pp, δ\delta, PP, PtestP_{\rm test}, PstandardP_{\rm standard}, ptp_t, aa, sws_w, dd, zz, PESWLP_{\rm ESWL}N/m³ or MPa/m; Pa; m; Nksk_s distinct from traffic density k; consistent mm system permitted; z depth in pavement context.
Pavement trafficWaW_a, WsW_s, FaF_a, FvF_v, NCVN_{\rm CV}, P0P_0, AA, DLD_L, rr, xx, nn, NmsaN_{\rm msa}load; factors; count; CV/day; fraction; years; msar fractional annual growth; x opening delay; DLD_L design-lane fraction with stated count basis.
Flexible responseMR,sM_{R,s}, MR,gM_{R,g}, MR,bM_{R,b}, hgh_g, εt\varepsilon_t, εv\varepsilon_v, NfN_f, NrN_r, KfK_f, KrK_r, CbC_bMPa; mm; strain; repetitionsModuli, granular thickness, positive strain magnitudes, regression coefficients and binder factor.
Concrete slabEE, ν\nu, hh, ℓ\ell, brb_r, LsL_s, BB, BdB_d, γc\gamma_c, μb\mu_b, α\alphaPa; 1; m; N/m³; 1/KGlobal E and ν retained; relative stiffness/resisting radius; dimensions; unit weight; base friction; thermal expansion.
Slab stresses and temperaturesσi\sigma_i, σe\sigma_e, σc\sigma_c, σtx\sigma_{tx}, σty\sigma_{ty}, σte,x\sigma_{te,x}, σtc\sigma_{tc}, σf\sigma_f, CxC_x, CyC_y, ΔT\Delta T, ΔTu\Delta T_uPa or MPa; 1; K differenceTension positive; ΔT=top−bottom; uniform temperature change distinguished.
Joint steelAs′A'_s, AbarA_{\rm bar}, sts_t, ϕ\phi, σs,allow\sigma_{s,\rm allow}, τbd\tau_{bd}, Ltie,devL_{\rm tie,dev}, ΔL\Delta Lm²/m; m²; m; PaSteel per joint length, bar area/spacing/diameter, allowable steel/bond stress, full development length, expansion.
Concrete fatigueSRSR, fcrf_{cr}, NN, njn_j, NjN_j, CFD\mathrm{CFD}1; MPa; repetitionsStress ratio, flexural strength, expected/allowable repetitions and cumulative damage.
Count expansionQdQ_d, QhQ_h, FdF_d, FmF_m, Δt\Delta t, Nmax⁡N_{\max}, qpeakq_{\rm peak}, PHF\mathrm{PHF}, AADT\mathrm{AADT}veh/day; veh/h; factors; min; countHour volume QhQ_h numerically equals one-hour count; peak subinterval rate distinguished.
Traffic speeduiu_i, utu_t, usu_s, uΩu_\Omega, ujourneyu_{\rm journey}, uˉ\bar u, upu_p, sus_u, σs\sigma_skm/hIndividual, time/space means, region speed, journey speed, mean, percentile, sample/spatial standard deviation.
Moving observerMM, OO, PP, tat_a, twt_w, tˉ\bar t, LLcount; h; kmMet, overtaking observer, passed by observer; against/with stream times, mean trip time and length.
Speed statisticsmim_i, nin_i, nn, LbL_b, N<N_<, nbn_b, wbw_b, pp, pjp_j, aja_j, bjb_j, UU, u0u_0, eue_u, zα/2z_{\alpha/2}speed; count; fraction; 1Class midpoint/count/boundaries, percentile fraction, mixture weights, random speed and threshold/error/normal critical value.
Accidents and arrivalsNaN_a, YaY_a, QeQ_e, RsegR_{\rm seg}, RintR_{\rm int}, λ\lambda, HH, N(t)N(t)count; year; veh/day; rates; veh/s; sRates per million veh-km/entries; H here headway, not airport elevation.
Fundamental traffic quantitiesqq, kk, hˉt\bar h_t, sˉ\bar s, did_i, tit_i, LΩL_\Omega, TΩT_\Omega, leffl_{\rm eff}veh/h; veh/km; s; m; km; hSpace–time trajectories use km and h; effective detector length must match density units.
Fundamental diagram parametersufu_f, ucu_c, u0u_0, kjk_j, kck_c, k0k_0, qmax⁡q_{\max}, wbw_bkm/h; veh/km; veh/hFree/critical/Greenberg speeds, jam/critical/scale densities; wbw_b positive backward-wave magnitude.
Waves and queuesww, QQ, AcA_c, DcD_c, qinq_{\rm in}, qoutq_{\rm out}, qaq_a, qbq_b, qdq_d, TbT_b, D\mathcal Dkm/h; vehicles; veh/h; h; vehicle-hoursw downstream-positive; cumulative counts and total delay.
Signal timinghsh_s, sis_i, ss, qiq_i, cic_i, XiX_i, CC, C0C_0, GiG_i, aia_i, rc,ir_{c,i}, lil_i, gig_i, LL, yiy_i, YYs; veh/h; fractionsC cycle, GiG_i displayed green, gig_i effective green; aia_i amber; lost time L local to signals.
Pedestrian timingGpG_p, tp0t_{p0}, WpW_p, vpv_ps; m; m/sRequired crossing time, start allowance, crossing width and walking speed.
Capacity adjustmentsqjq_j, EjE_j, pjp_j, fHVf_{HV}, fpf_p, NlN_l, vpv_p, KDK_D, DDD_D, Qh,dirQ_{h,\rm dir}, SlaneS_{\rm lane}veh/h; PCU/veh; fractions; lanes; pc/h/lanevpv_p here adjusted demand, not pedestrian speed; context fixed by section.
Trip generationOiO_i, DjD_j, Dj∗D_j^*, β0\beta_0, βr\beta_r, XirX_{ir}, HicH_{ic}, rcr_ctrips/period; fitted units; households; trips/household/periodProductions/origins, attractions, balanced attractions, regression and category inputs.
DistributionTijT_{ij}, cijc_{ij}, f(cij)f(c_{ij}), AiA_i, BjB_j, FF, β\betatrips/period; cost; factorsCost units fixed before deterrence; β has reciprocal cost units for exponential.
Mode choicePmP_m, UmU_m, TijmT_{ijm}, cmc_m, θ\thetaprobability; dimensionless utility; trips; cost; inverse costHigher utility preferred; Um=−θcmU_m=-\theta c_m for disutility model.
Assignmenttat_a, ta0t_{a0}, xax_a, cac_a, αB\alpha_B, βB\beta_B, fijrf_{ijr}, δa,ijr\delta_{a,ijr}, TijvehT_{ij}^{\rm veh}min; veh/h; 1Link time/flow/capacity; cac_a here link capacity, not railway cant; route flow and link incidence.
Bank angle and design limit notationθ\theta, fT,max⁡f_{T,\max}, ca,max⁡c_{a,\max}, cd,max⁡c_{d,\max}, cx,max⁡c_{x,\max}angle; fraction; mmBank angle satisfies e=tan⁡θe=\tan\theta; max subscripts denote allowed lateral friction, actual cant, deficiency and excess.

Revise offline: the whole Transportation Engineering handbook as one PDF

55 pages · 2.6 MBFree to read online. Sign in to download the PDF.We save the handbook, version and request time in My downloads. Privacy policy

All chapters · Corrections