Symbols and units
Symbols are local to the named topic where indicated. Use hours, days, months or years consistently; all unlabelled ratios are fractions.
| Quantity | Symbol | Unit | Note |
|---|---|---|---|
| Time and counts | , , , , | stated time unit; dimensionless indices/counts | Use a single time basis; indices are local, and i denotes a carrying/discount fraction only in cost sections. |
| Element and standard times | , , , , , , | min/unit or s/unit; factors dimensionless | f_i occurrences/unit; r_i rating fraction; allowances based on normal or standard time as subscripted. |
| Work-sampling and precision | , , , , , , , , , , , | counts; fractions; time | z standard-normal multiplier; T_o total worker-time; r rating; s_t sample time deviation. |
| Productivity and labour efficiency | , , | output/input; fraction; worker-time | N_o t_S is earned standard labour-time. |
| Learning curve | , , , , , | fractions/exponent; time | r_L doubling ratio; cumulative-average and individual-unit models distinguished. |
| Demand and forecast | , , , , , | units/period; count; fractions | e_t = D_t − F_t; w_0 weights latest observation. |
| Regression, trend and seasonality | , , , , , , , , , , , , | demand/predictor units as defined; fractions; counts | h horizon steps here; S_t seasonal effect/index; b regression slope; b_t trend increment. |
| Forecast error statistics | , , , , , , | demand; squared demand for MSE; % for MAPE; fraction for TS | Actual minus forecast sign convention. |
| Aggregate production and material balance | , , , , , , | units in each period or units at period end | Stock/backlog; regular/overtime/subcontract receipts; demand; sales. |
| Workforce and capacity | , , , , , , | workers; units/(worker-hour); hours; hours/unit | L_t layoffs, distinct from inventory lead time L; c_jt capacity hours. |
| Aggregate plan cost | , , , , , , , , | ₹; ₹/unit; ₹/(worker-period); ₹/worker | r_i revenue/unit in this section, h_i ₹/(unit-period); exclude duplicate wage charges. |
| Job schedule and urgency | , , , , , , , , , , | time except positive weights and CR | Completion/release/due/flow/lateness/tardiness/earliness; CR uses d_j−t. |
| Machine sequence | , , , , , , , , | time; permutation index | Machine durations; completion times; starts; minimum no-wait separation. |
| Line balance | , , , , , , , , | time/unit; count; time; fractions | C cycle time; N_s stations; no temperature or cost meaning in this section. |
| BOM and MRP quantities | , , , , , , , , | item units; child units/parent | Gross/net requirements, projected available, scheduled/planned receipts, planned releases. |
| Part-period quantities | , , | unit-periods; coverage-period count | EPP = K/h for the chosen period basis. |
| Inventory rates and quantities | , , , , , , , , , , , , | units/time; units; fraction; time; orders/time | P production rate, D demand; g = 1−D/P, or 1 for instantaneous supply. |
| Inventory costs and prices | , , , , , , , , , , , | ₹/order; ₹/unit; ₹/(unit-time); fraction; ₹/time | pi shortage cost per unit-time; A_j premium/order for incremental tier; k lot/EOQ ratio. |
| Lead-time uncertainty | , , , , , , , , , | base-period count; demand units; probabilities | sigma denotes statistical deviation, not stress; Phi normal CDF; SS extra buffer. |
| Inventory review | , , , , , , , | time/period count; units; units/time | R review interval locally; IP includes on-order stock and subtracts backorders. |
| Lean flow and kanban | , , , , , , , , , , , | units; units/time; time; time/unit; fractions; counts | L_K whole replenishment loop; q_K units/container. |
| Equipment effectiveness | , , , , , , , , | fractions; time; time/unit; counts | OEE factors are availability/performance/quality. |
| Defect and yield metrics | , , , , , , , , | counts; fractions; defects per stated denominator | Several defects may occur in one defective unit. |
| Quality distribution and capability | , , , , , , , , , , | characteristic units (e.g. mm); fractions/indices | Within-process sigma for C indices; overall sigma for P indices. |
| Combined variation | , , , , , , , , | characteristic units; covariance in product units | Same notation as statistical assembly in the Metrology and Inspection handbook; k is limit multiplier here. |
| Variable-chart statistics | , , , , , , , , , | measurement units; dimensionless factors/counts | R subgroup range, not reliability or review interval in this section; CL/UCL/LCL centre/upper/lower control limit. |
| Attribute charts | , , , , , , | fractions; counts; defects/exposure | p nonconforming fraction; c defect count; u defects per inspection exposure. |
| Acceptance sampling | , , , , , , , , , , , | probabilities/fractions; item counts | M lot nonconforming count; producer/consumer risks at specified quality levels. |
| Reliability and lifetime | , , , , , , , , | time; probability; 1/time | R survival; f_f density; lambda conditional hazard; q failed fraction. |
| Weibull parameters | , , | time; dimensionless shape/function | Same Weibull notation as the Machine Design handbook; this b is not the Chapter 2 regression slope. |
| Reliability estimation and systems | , , , , , , , | failures; total time at risk; probabilities; counts | System formulas require specified independent survival events. |
| Repair and availability | , , , , | fraction; time; 1/time; probability | MTBF means mean operating uptime here; M repair completion CDF. |
| Lifecycle and warranty | , , , , , , , , , , | ₹; discount fraction; years; counts; ₹/claim; time | N_s sold-unit count locally; V_N salvage, negative for disposal cost. |