Load flow finds a balanced steady-state operating point. The inputs are bus powers and voltage controls; the unknowns are voltage magnitudes, angles and balancing generation. Fault and transient models are different calculations.
5.1 Building the bus admittance matrix
Past papers · EE 2020–2026 (7 papers): 4 questions, 7 marks
All bus currents are injections into the passive network. Include line charging, shunts and transformer taps before solving for voltages.
For reciprocal untapped lines, is symmetric but generally not Hermitian. A phase-shifting tap can make it nonsymmetric. Without shunts or ground reference, row sums vanish and the isolated passive network matrix is singular. When invertible, ; each element is not the reciprocal of the corresponding admittance element.
A nonzero injected current at an eliminated bus also changes the retained current vector. Do not remove a PQ load bus as though it were a zero-injection junction.
5.2 Bus types and power equations
Past papers · EE 2020–2026 (7 papers): 3 questions, 4 marks
Let and : generation minus demand. A purely reactive voltage controller can be a PV bus even when its specified real injection is zero.
| Bus type | Specified | Solved |
|---|---|---|
| Slack/reference | ||
| PV | ||
| PQ |
Scheduled real generation normally comes from economic dispatch, rather than the nameplate rating. A source controlling voltage and frequency in an isolated island serves as its reference. One reference is required for each electrically separate AC island. The slack supplies the mismatch including losses; its power is not known in advance.
If a PV generator reaches a reactive limit, fix its generated at that limit, subtract local reactive demand, and solve that bus as PQ. Its voltage magnitude can then depart from the setpoint.
5.3 Gauss–Seidel iteration
Update buses one by one using the newest available voltage. Hold the slack phasor fixed throughout.
Optional acceleration uses , with question-specified . More acceleration is not always faster or convergent. Check power mismatches, not just a single voltage change.
5.4 Newton–Raphson iteration
Past papers · EE 2020–2026 (7 papers): 2 questions, 2 marks
Use mismatch = specified injection minus calculated injection. Form derivatives of calculated powers. Reversing only one of those signs reverses the correction.
Angles are in radians for derivatives. Include mismatches at all nonslack buses and mismatches only at PQ buses. A change from PV to PQ adds one voltage-magnitude unknown and one reactive-power equation.
5.5 Line flows and the small-angle approximation
Past papers · EE 2020–2026 (7 papers): 3 questions, 6 marks
After solving bus voltages, calculate each end of each branch separately. The sum of its end injections is the branch's net absorbed complex power.
The “DC load flow” is an approximation to an AC system. It ignores reactive power and real losses; it is not a physical HVDC-line model. A decoupled Newton variant can approximate its Jacobian while still iterating the full AC mismatches to tolerance; that does not make its converged solution a DC load-flow solution. The DC load-flow reduced angle matrix is nonsingular only after an appropriate reference is fixed in a connected network.
Last-minute recall
- Load powers enter as negative net injections.
- A bus type is determined by controlled quantities, not just by equipment name.
- Build shunts and taps before calculating .
- Gauss–Seidel uses newly updated values immediately.
- Newton mismatch and derivative signs must agree.
- Jacobian dimension is per side.