Networks use nodes for locations and arcs for permitted connections. Capacity limits how much may pass; arc cost prices each unit. Project networks from Chapter 1 use a different interpretation: their arc weights are durations and their controlling path is longest.

8.1 Conservation and minimum-cost flowME

On directed arc i→ji\to j, let xijx_{ij} be flow, uiju_{ij} capacity and cijc_{ij} unit cost. Let bib_i be external supply at node ii, positive for a source, negative for a demand and zero for transshipment.

For a lower bound ℓij\ell_{ij}, substitute xij=ℓij+xij′x_{ij}=\ell_{ij}+x'_{ij}, use capacity uij−ℓiju_{ij}-\ell_{ij}, and change node supply to bi−∑jℓij+∑jℓjib_i-\sum_j\ell_{ij}+\sum_j\ell_{ji}. Include the constant cost of the lower-bound flow. Transportation and assignment are special cases of node balance.

In a residual network, unused forward capacity carries the original cost; cancellation of existing flow is a backward arc with the negative original cost. A feasible flow is minimum-cost exactly when its residual network contains no negative-cost directed cycle. If a negative cycle exists, send its minimum residual capacity around the cycle; node balances are preserved and cost decreases. Recheck until no such cycle remains.

8.2 Shortest pathsME

Let wijw_{ij} be the length, time or cost of traversing arc i→ji\to j once. A shortest path minimises the sum of these weights from source ss to a destination.

With negative weights in a general directed graph, Bellman–Ford performs up to ∣V∣−1|V|-1 full passes over the arcs, where ∣V∣|V| is the node count. A further reachable improvement indicates a reachable negative cycle; a destination has no finite shortest-walk value if such a cycle can also reach that destination. Unreachable nodes retain infinite distance.

8.3 Maximum flow, residual capacity and cutsME

A maximum-flow model has source ss, sink tt, nonnegative capacities and zero net supply at intermediate nodes. Flow value FF is net outflow from ss, equal to net inflow to tt.

Keep residual arcs associated with their original arcs when both directions exist. Repeat augmentation until no residual source-to-sink path remains. Nodes reachable from ss in that final residual network define a minimum cut and certify optimality. With integral capacities, integral augmentations produce an integral maximum flow.

A feasible flow of 9 units/hour meets a cut of the same capacity. Arc labels show flow/capacity.A feasible flow of 9 units/hour meets a cut of the same capacity. Arc labels show flow/capacity.

8.4 Minimum spanning connectionsME

A minimum spanning tree (MST) connects all nodes of a connected undirected weighted graph with minimum total edge cost. It is a connection-design model, not a route or a shipment allocation. A tree on nn nodes has n−1n-1 edges and no cycle.

Kruskal's method scans edges in increasing weight and accepts an edge only if it joins two separate components. Prim's method grows a tree by repeatedly adding the cheapest edge between the current tree and an outside node. Either method yields an MST. Ties can produce several MSTs with the same total cost; disconnected input gives a minimum spanning forest, not one spanning tree.

Last-minute recall

  • State whether an arc label is cost, length, duration or capacity.
  • Use outflow minus inflow equals positive supply consistently.
  • Residual backward arcs permit cancelling previous decisions.
  • Dijkstra requires nonnegative weights.
  • A feasible flow matching a cut capacity is maximum.
  • Cut capacity counts outward arcs only.
  • An MST has n−1n-1 edges and no cycle.