How to use this handbook
Read each formula with its assumptions; a correct expression used for the wrong model gives a wrong answer. Formula boxes hold results, watch boxes identify traps, and why boxes give short checks you can reproduce. Examples use original numbers. Times may be in hours, days or weeks; use one time unit throughout a calculation. Untagged Chapters 1–3 serve CE and ME. Chapters 4–9 carry ME tags and are required only for ME. “New in 2027” marks the AOA/AON network wording added to the GATE 2027 CE syllabus; PERT and CPM were already examined. Network arrows encode precedence or flow as specified; a project duration is a longest-path quantity. Queue lengths include service only when labelled “system”; arrival and service rates must use the same time basis. Linear programmes use continuous variables unless an integrality condition is explicitly stated. Probability and matrix prerequisites: see the Engineering Mathematics handbook.