Formula index

Formula boxSection
Bligh and Lane creep lengths6.1
Bligh residual head6.1
Canal boundary shear5.4
Command area and irrigation intensity2.1
Confined Thiem equation10.2
Dupuit–Thiem unconfined equation10.3
Duty across a loss reach2.2
Duty–delta conversion2.2
Earthfill section and freeboard9.3
Economical trapezoid at fixed side slope5.1
Elementary section limits3.4
Field application rate1.3
Floor weight against uplift6.2
Gravity-dam equilibrium checks3.2
Hydrostatic, weight and uplift loads3.1
Ideal border advance1.3
Irrigation efficiency definitions2.3
Irrigation pump sizing10.5
Irrigation water balance2.3
Kennedy critical velocity5.3
Khosla end-pile head fractions6.3
Khosla exit gradient6.3
Khosla pile interference and thickness correction6.4
Khosla slope correction6.4
Lacey normal scour estimate8.3
Lacey regime relations5.3
Linear base contact pressure3.3
Open-well recuperation and pumping balance10.4
Outlet flexibility and setting5.5
Overflow spillway discharge4.1
Peak and intermittent supply2.5
Root-zone storage and interval2.4
Sediment threshold and side-slope reduction5.4
Silt thrust and pseudo-static inertia3.5
Specific capacity and well losses10.4
Standard downstream ogee profile4.2
Standard rounded-bottom geometry5.2
Steady salt balance2.6
Stress on a sloping downstream face3.3
Trapezoidal canal hydraulics5.1
Westergaard approximate hydrodynamic load3.5

Revise offline: the whole Irrigation Engineering handbook as one PDF

48 pages · 2.0 MBFree to read online. Sign in to download the PDF.We save the handbook, version and request time in My downloads. Privacy policy

All chapters · Corrections